Dairy Manure Compost Temperature Log
Temperature tells you whether a pile is working. A probe, a notebook and a routine show when heat peaks, when to turn and when the pile is cooling too early. This log turns scattered readings into a count of hot days.
Why it matters
Heat drives pathogen and weed seed reduction, but a single reading at one spot can fool you. Cool pockets survive in the edges. Required temperature and time targets vary with the method and program, so confirm them with your state agency or extension before you rely on the record.
Step by step
- Use a long-stem compost thermometer and check it in ice water and warm water against a reference before the season starts.
- Take readings at the same time each day at five or more spots, at about 18 inches deep, including cooler edges and the pile center.
- Record each reading, the date, air temperature and the day count from the pile build, then average the spots for a daily figure.
- Count the days the whole pile stays at or above your target, and restart the count after any day the coolest spot falls below it.
- Turn or aerate as the plan states, usually after the pile peaks and starts to fall, then log the turn date and reading change.
- If any reading nears 160 F or the core steams heavily, spread the pile to cool it, since very hot piles can ignite; call emergency services for smoke or flame.
Worked example
Illustrative: Five spots read 135, 141, 128, 150 and 138 F, which total 692 F, so the average is 692 / 5 = 138.4 F, but the 128 F edge is below an illustrative 131 F target. Daily averages from day 3 to day 9 are 136, 142, 148, 145, 140, 137 and 133 F. That is 7 days at or above target, with a total of 981 F and an average of 981 / 7 = 140.1 F.
Printable worksheet: compost temperature log
- Pile or windrow number and build date: ____________________
- Date ______ ; day count ______ ; air temperature ______ F
- Spot readings: ______ , ______ , ______ , ______ , ______ F
- Average = total / spots: ______ F ; coolest spot ______ F ; target ______ F
- Consecutive days at or above target: ______ ; turned on (date): ______
- Steam, odor or overheating notes: ____________
- Thermometer checked against reference on (date): ______
Common mistakes
- Probing only the center, which reads hot while the edges stay cool and untreated.
- Counting days from the build date even when the coolest spot never reached the target.
- Turning on a calendar schedule rather than after the pile peaks, which can cool a good pile early.
- Leaving a very hot pile in place when readings climb, which raises the risk of fire.
Frequently asked questions
What temperature is high enough?
Targets depend on the method, such as windrow or static pile, and on program rules. Ask your state agency, certified planner or extension for the figure that applies, and write it on your log.
Why does a pile cool too soon?
Common causes are too much moisture, too little carbon, poor airflow or a pile that is too small. Check moisture and the blend first, and then ask extension or a planner about the pile size.
Do I need to keep these records?
Many programs, buyers and nutrient plans expect them, and they protect you if a customer asks. Ask your agency what is required, and keep logs for the period they suggest.
Official sources
Educational only. Permit, setback and application rules vary by state; confirm with your state agency, NRCS and a certified planner. State dairy waste resources.