Manure pits and tanks can kill within moments, and a would-be rescuer is often the second victim. Before anyone enters, you verify what the contractor has in writing, and you never enter yourself.

Why it matters

Manure gas, low oxygen and engulfment are deadly and give little warning. Hiring a contractor does not move your duty to know who is working on your site. Follow OSHA confined space rules and the contractor plan, and call emergency services for any collapse, never rescue by entering.

Step by step

  1. Ask for the written entry program, permit form and proof of training for the entrant, the attendant and the supervisor, and read them before work starts.
  2. Confirm the contractor owns calibrated gas monitors that read oxygen and toxic gases, and ask for the calibration or bump test record for the day.
  3. Ask who does rescue, how fast they can arrive, what equipment they bring and whether it has been practiced, and do not accept a plan that says to call 911.
  4. Verify lockout of pumps, agitators and inflow lines, and check that every pipe that could release gas into the space is isolated.
  5. Confirm forced ventilation is set up, and check that the plan states how many air changes occur before entry and keeps running during the work.
  6. Hold a pre-job meeting, sign the checklist together, and stop the job if anything on the list is missing or changes.

Worked example

Illustrative: A pit is 20 x 30 feet and 10 feet deep, so 20 x 30 x 10 = 6,000 cubic feet. A blower moves 1,500 cubic feet per minute, so one air change takes 6,000 / 1,500 = 4 minutes. A written plan calling for 5 air changes means 5 x 4 = 20 minutes of running before entry. The contractor's plan and monitors decide actual limits. Of 10 checklist items, 8 are verified, which is 80 percent, so work waits.

Printable worksheet: contractor confined space verification

  • Contractor, supervisor and date: ____________________
  • Space dimensions ______ x ______ x ______ ft = ______ cu ft
  • Blower ______ cfm ; minutes per air change = volume / cfm: ______ ; changes required ______
  • Minutes of ventilation before entry = changes x minutes per change: ______
  • Gas monitor tested on (date and by): ____________
  • Rescue provider, arrival time and equipment: ____________
  • Checklist items verified ______ of ______ ; work approved by (name): ______

Common mistakes

  • Letting a worker enter because the pit looks empty or smells fine, when the gas can be odorless at harmful levels.
  • Accepting a rescue plan that relies on a farm worker climbing in after a collapsed entrant.
  • Skipping the monitor check since the contractor says it was tested last week.
  • Treating a signed form as proof, when the isolation and ventilation were never checked on site.

Frequently asked questions

Can a farm worker act as attendant?

Only if properly trained and the plan allows it. Attendants stay outside and never enter to rescue. Ask the contractor and OSHA or your state agricultural safety program what training is required.

What if there is an emergency?

Call emergency services at once, tell them it is a confined space and manure gas, keep everyone out and follow dispatcher directions. Entering without equipment and training often adds victims.

Is a bigger vent fan enough?

No. Ventilation helps, but gas can return when manure is stirred, and monitors must keep reading. Ventilation, testing, isolation, an attendant and a rescue plan all work together.