Dairy Environmental Consultant Questions
A consultant writes plans, designs storage or handles inspections, and quality varies. This guide gives you scored interview questions and shows how to compare quotes fairly by cost per acre rather than by total price alone.
Why it matters
The cheapest quote often covers less work, and the best talker may lack local rule knowledge. A written scope and a scored comparison make the choice clear. Certification requirements differ by state, so ask your state agency or NRCS who qualifies for the work you need.
Step by step
- Write the job in a paragraph covering the plan type, acres, structures, deadlines and whether you need design, inspection or both.
- Ask each candidate for credentials, years working with dairies in your state, and three references with similar herd size.
- Ask what is included in the fee, such as site visits, soil sampling, revisions, agency meetings and updates, and get it in writing.
- Ask how they handle a rule change, a failed inspection or a question outside their field, and who answers if they are away.
- Score each answer from 0 to 2 against the same list, add the points, and divide by the maximum to get a percent score.
- Compute fee per acre for each quote, weigh it alongside the score and references, and call two references before signing.
Worked example
Illustrative: Consultant A quotes $4,800 for 640 acres, so $4,800 / 640 = $7.50 per acre. Consultant B quotes $5,400 for 600 acres, so $5,400 / 600 = $9.00 per acre. On 10 questions scored 0 to 2, the maximum is 20. A scores 17 of 20 = 85 percent and B scores 14 of 20 = 70 percent. A is cheaper per acre and scores higher, but you still check references before deciding.
Printable worksheet: consultant interview and comparison
- Consultant, company and date: ____________________
- Credentials and state experience: ____________
- Fee quoted $______ / acres ______ = $______ per acre
- Score ______ points / maximum ______ = ______ percent
- Scope included (visits, revisions, meetings): ____________
- References called (names and dates): ____________
- Written scope received (yes or no) ; decision and date: ______
Common mistakes
- Choosing on total price when the quotes cover different acres and different amounts of work.
- Skipping reference calls because the consultant came recommended by a friend.
- Leaving revisions and agency meetings out of the scope, then paying extra for each one.
- Asking different questions of each candidate, which makes the scores impossible to compare.
Frequently asked questions
Do they need to be certified?
Requirements vary by state and by the kind of plan. Ask your state agency or NRCS who may write plans for your operation, and ask the consultant for proof of the credential in writing.
Can my feed or equipment dealer do this?
Dealers know products, but a plan has legal and technical content. Ask whether they hold the credentials your state requires, and have a certified planner review anything you file with an agency.
Who owns the plan?
Agree on this in the contract. You should receive complete editable copies and records. Ask an attorney to review the agreement if the project is large or involves design and liability.
Official sources
Educational only. Permit, setback and application rules vary by state; confirm with your state agency, NRCS and a certified planner. State dairy waste resources.