Dairy Farm Water Pollution Prevention Plan

A prevention plan lists every place water on a dairy could pick up manure, silage juice or chemicals, ranks them by risk, and assigns a control and an owner to each. This guide shows a simple scoring method.

Why it matters

Without a ranking, effort goes to the easiest fix and not the greatest risk. Scoring puts the biggest threats first and shows which controls are working. Required plans, permits and wording vary by state and herd size, so ask your state agency or planner what applies to you.

Step by step

  1. List every source of pollution on the farm, including lots, feed storage, parlor water, manure stacks, calf areas, fuel and chemical storage.
  2. Score likelihood of release from 1 to 5 and consequence to a stream or well from 1 to 5 for each source.
  3. Multiply the two scores for a risk number, then sort the list from highest to lowest.
  4. Assign a control to each high-risk source, such as a berm, a roof, a basin, a lid or a schedule change.
  5. Name one person and one due date for each control, and set a monthly or after-rain inspection.
  6. Write down the spill steps: stop the source, contain it, call the right agency and notify neighbors downstream.

Worked example

Illustrative: Six sources are scored likelihood x consequence. Lot runoff is 4 x 5 = 20, silage leachate 3 x 4 = 12, manure stack 3 x 3 = 9, parlor wastewater 2 x 4 = 8, chemical storage 1 x 5 = 5 and calf hutches 2 x 2 = 4. The total is 20 + 12 + 9 + 8 + 5 + 4 = 58. The top two sources add up to 32, which is 32 / 58 = 55 percent of the risk, so they get the first budget.

Printable worksheet: dairy farm water pollution prevention plan

  • Farm, planner and date: ____________________
  • Source ____________ ; likelihood ______ x consequence ______ = ______
  • Source ____________ ; likelihood ______ x consequence ______ = ______
  • Total risk of all sources: ______ ; top two sources = ______ percent
  • Control chosen, owner and due date: ____________
  • Inspection schedule (monthly or after rain): ____________
  • Spill contact numbers posted (yes or no): ______

Common mistakes

  • Scoring only what has failed before and ignoring a low-odds, high-harm source such as a chemical store.
  • Writing controls with no owner, so nothing is done until an inspector arrives.
  • Filing the plan in a drawer, when the people who work the farm never see it.
  • Not updating scores after the herd, the facilities or the weather pattern change.

Frequently asked questions

Is a written plan required?

It depends on your state, herd size and permit status. Ask your state agency or an NRCS planner. Even where no plan is required, a written one makes it easier to train staff and respond to a problem.

How often should I rescore?

At least yearly and whenever something changes, such as new cows, a new lot or a major storm. A quick review after each large rain helps catch problems before they escalate.

Who can help me write it?

Extension educators, NRCS planners, conservation districts and certified planners can all help. Many offer free technical help, so ask what is available before you hire anyone.

Official sources

Educational only. Permit, setback and application rules vary by state; confirm with your state agency, NRCS and a certified planner. State dairy waste resources.