Dairy Waste & Nutrient Management

Dairy Lagoon Freeboard Observation Log

Freeboard is the vertical gap between the liquid surface and the lowest point of the embankment or overflow. This log turns weekly gauge readings into a rise rate, so you can see how many days remain before the gap gets too small.

Why it matters

A lagoon can look fine for weeks and then close up quickly after wet weather. Dated readings show the trend before it becomes an emergency. Your permit, plan or NRCS design sets the minimum freeboard and the pump-down level; rules vary by state, so ask your state agency, NRCS or a certified planner.

Step by step

  1. Read the staff gauge at the same time each week, from the same spot, and write the reading with the date, since glare and waves change what you see.
  2. Record the gauge mark for the lowest point of the embankment crest or spillway, then subtract the liquid reading to get freeboard in feet.
  3. Multiply feet by 12 for inches, and compare the result with the minimum written in your plan, not a number remembered from a neighbor.
  4. Note rain, inflow from the parlor and wind in the remarks column, because each one explains a jump in the reading.
  5. Divide the change between two readings by the days between them to get the rise per day, then divide room above the minimum by that rate.
  6. Flag any reading inside the minimum, call your planner or agency contact the same day, and stop adding any avoidable water to the lagoon.

Worked example

Illustrative: The crest mark is 12.0 ft on the gauge. Three weeks ago the liquid read 9.8 ft, and today it reads 10.4 ft. Freeboard is 12.0 - 10.4 = 1.6 ft, or 1.6 x 12 = 19.2 in. The rise is 0.6 ft in 21 days, which is 0.0286 ft per day, or about 0.34 in per day. With an illustrative minimum of 12 in, the room left is 19.2 - 12 = 7.2 in, and 7.2 / 0.343 = 21 days at the current rate.

Printable worksheet: dairy lagoon freeboard observation log

  • Date, time and reader: ____________________
  • Crest or spillway mark ______ ft ; liquid reading ______ ft
  • Freeboard = crest - liquid: ______ ft x 12 = ______ in
  • Minimum from my plan ______ in ; room left = freeboard - minimum: ______ in
  • Rise per day = change / days between readings: ______ in
  • Days left = room left / rise per day: ______
  • Rain and inflow notes: ____________

Common mistakes

  • Measuring freeboard to the water line on the near bank instead of to the lowest point of the crest, which overstates the gap.
  • Reading the gauge on a windy day without noting waves, then treating the scatter as a real trend.
  • Using last year minimum after the plan or permit has been revised.
  • Logging the number and never calculating the rate, so the warning arrives only when the gap is already small.

Frequently asked questions

Where should the gauge go?

Place it where you can read it safely from the bank, away from the inlet pipe and outside the wind-driven pile-up on the downwind side. Ask your NRCS office or planner how the original design marked the levels.

How often should I read it?

Weekly is a common rhythm, with extra readings before and after big storms. Your permit or plan may require something specific, so follow it and ask your state agency if the wording is unclear.

What if the level rises with no rain?

Check for a stuck valve, a leaking water line or a flush that ran long. Compare the volume added to what the parlor and barn should send, and ask an extension or planner contact if it stays unexplained.

Official sources

Educational only. Permit, setback and application rules vary by state; confirm with your state agency, NRCS and a certified planner. State dairy waste resources.