Dairy Manure Contractor Comparison

A bid priced per hour and a bid priced per gallon are not the same offer. This guide puts every contractor quote and your own equipment cost onto one unit, dollars per 1,000 gallons, so the comparison is fair.

Why it matters

Dairies often pick the lowest number on the page without asking what it covers. Agitation, pumping, travel time, spills, record keeping and rule compliance can sit on either side of the line. Ask your state agency or certified planner who is responsible for the permit and application records.

Step by step

  1. Write down the volume you must move this year in gallons, using storage records or the nutrient plan rather than a guess.
  2. Ask each contractor for a written bid stating the unit, such as per hour, per load or per 1,000 gallons, and what is included.
  3. Convert hourly bids to a gallon basis by dividing the hourly rate by gallons moved per hour on a past job.
  4. Total your own annual fixed cost (depreciation, interest, insurance, housing) and variable cost per gallon (fuel, labor, repairs).
  5. Compute the break-even volume as fixed cost divided by the difference between the contractor rate and your variable rate.
  6. Check references, insurance certificates, agitation plans and who keeps the application records, then choose on total cost and reliability together.

Worked example

Illustrative: You must move 2,000,000 gallons. A contractor quotes $0.012 per gallon, so the bill is 2,000,000 x 0.012 = $24,000. Owning costs $9,000 fixed plus $0.008 per gallon variable, or 9,000 + 2,000,000 x 0.008 = $25,000. Break-even volume is 9,000 / (0.012 - 0.008) = 2,250,000 gallons. At 2,000,000 gallons the contractor is $1,000 cheaper; above 2,250,000 gallons ownership wins, if you also have the labor and time.

Printable worksheet: manure contractor comparison

  • Contractor name and bid unit: ____________________
  • Gallons to move this year: ______ ; bid rate per gallon: ______ ; total bid = gallons x rate: ______
  • Own fixed cost per year ______ ; own variable cost per gallon ______ ; own total: ______
  • Break-even gallons = fixed / (bid rate - variable rate): ______
  • Included in bid (agitation, pumping, records): ____________
  • Insurance certificate and references checked on: ______
  • Choice and reason: ____________

Common mistakes

  • Comparing a per-hour bid with a per-gallon bid without converting, so the cheaper-looking quote is actually the costlier one.
  • Leaving out your own labor and the cost of a late job when you price owning the equipment.
  • Skipping the written scope, then paying extra for agitation or a second pass that you assumed was included.
  • Assuming the contractor handles the permit records without asking who signs and keeps them.

Frequently asked questions

Should the lowest bid win?

Not automatically. A low rate that leaves out agitation, cleanup or records can cost more in the end. Compare scope and reliability, and ask your extension educator what a typical bid should include in your area.

Who is responsible for a spill?

Responsibility depends on your contract, your state rules and who controlled the equipment. Put it in writing before work starts, and ask your state agency and an attorney or insurer what applies to you.

Can I split the work?

Yes. Many farms hire a contractor for peak weeks and use their own tanker for small, nearby fields. Price each part on the same gallon basis and compare the combined total with one-source options.